For a pre-Brownian motion B and a simple (elementary) adapted process V, the process-level Ito integral (V dot B)_t lies in L2(mu) at every finite time t. The analytic content underpinning the L2 Ito-integral construction.
{Ω : Type u_1} → {mΩ : MeasurableSpace Ω} → {B : NNReal → Ω → ℝ} → (hBmeas : ∀ (t : NNReal), Measurable (B t)) → SimpleProcess ℝ (natFiltration hBmeas) → NNReal → Ω → ℝProcess-level elementary Itô integral of a simple V against Brownian motion B, at finite time t. Degenne's SimpleProcess.integral against multiplication, evaluated at the deterministic stopping time t.
Since the 2026-07-27 pin his integral is indexed by ι itself rather than WithTop ι, so the time argument is t : ℝ≥0 with no coercion; the semantics are unchanged (the definition still truncates each increment at t).