MathFin
Map / Probability · Brownian calculus / MathFin.Probability.Brownian.Ito.ItoProcessPredictable

Predictability and `L²` assembly of the Itô process (the SDE-existence keystone)

MathFin.Probability.Brownian.Ito.ItoProcessPredictableMSC 60H10MSC 60H05MSC 60G07 source

To run a Picard iteration for the SDE dX = b(X)dt + σ(X)dB inside the predictable L² space E := Lp ℝ 2 (trimMeasure T), the Itô term t ↦ (φ ● B)_t, assembled as a space-time function, must itself be predictable — otherwise the iterate cannot be fed back through the Itô integral (whose integrand domain is the predictable L² space). This is the one genuinely new regularity fact the construction needs: everything before ItoIntegralProcessGeneral only ever needed the process to be adapted at each fixed time (into Lp μ), never jointly predictable in (t, ω).

Mathlib's Probability/Process/Predictable.lean supplies only the easy direction (predictable ⟹ adapted). The hard direction — a left-continuous adapted process is predictable — is Degenne's StronglyAdapted.isStronglyPredictable_of_leftContinuous, which needs left-continuity on every path. We apply it not to the continuous modification itoContinuousMod directly, whose paths are continuous only almost surely, but to each elementary Itô integral itoSimpleProcess V, which is genuinely continuous for every ω (from Brownian path continuity) and genuinely adapted (its martingale property). Predictability of the general process then lifts through the pointwise limUnder that defines itoContinuousMod (StronglyMeasurable.limUnder), so itoContinuousMod is predictable, and in particular adapted, for the natural filtration itself; no augmentation is needed.

  • path continuity is ItoIntegralProcess.itoSimpleProcess_pathContinuous, consumed here.
  • itoSimpleProcess_isStronglyPredictable — the elementary integral is predictable.
  • itoContinuousMod_isStronglyPredictable — the general assembled process is predictable.
  • memLp_itoContinuousMod — the assembled process is L² in the predictable trim measure.
  • itoProcessAssembled — it, packaged as an element of Lp ℝ 2 (trimMeasure T) (the space a Picard iterate for the SDE lands in).
  • itoProcessAssembled_norm_sq — the energy identity ‖itoProcessAssembled φ‖²_E = ∫₀ᵀ ‖(φ●B)_t‖² dt (the contraction workhorse for the SDE fixed point).
  • itoProcessAssembled_add / itoProcessAssembled_sub — linearity of the assembled process (as an Lp class), so the contraction difference reduces to the energy identity via itoProcessCLM's linearity.

Main definitions

  • itoProcessAssembled: the space-time function (t,ω) ↦ (φ ● B)_t(ω), the continuous modification, as an element of Lp ℝ 2 (trimMeasure T).

Main results

  • itoSimpleProcess_isStronglyPredictable: the elementary Itô integral is predictable as a space-time function.
  • itoContinuousMod_isStronglyPredictable: the assembled Itô process itoContinuousMod is predictable.
  • memLp_itoContinuousMod: itoContinuousMod is in L² for the predictable trim measure.
  • itoProcessAssembled_norm_sq: ‖itoProcessAssembled φ‖² = ∫₀ᵀ ‖(φ ● B)_t‖² dt.
  • itoProcessAssembled_norm_le: ‖itoProcessAssembled φ‖ ≤ √T · ‖φ‖.
  • itoProcessAssembled_add, itoProcessAssembled_sub: the assembled Itô process is additive and subtractive in the integrand.

Tags

predictable process, Picard iteration, SDE existence, stochastic differential equation, Itô integral, left-continuous adapted, MSC 60H10, MSC 60H05, MSC 60G07

Import neighbourhood

Above: what it imports. Below: what imports it.

Declarations 8

theoremMathFin.ItoIntegralProcessContinuousModification.itoSimpleProcess_isStronglyPredictablesource
∀ {Ω : Type u_1} {mΩ : MeasurableSpace Ω} {μ : Measure Ω} {B : NNReal → Ω → ℝ}, IsPreBrownianReal B μ → ∀ (hBmeas : ∀ (t : NNReal), Measurable (B t)), (∀ (ω : Ω), Continuous fun t => B t ω) → ∀ (V : SimpleProcess ℝ (natFiltration hBmeas)), IsStronglyPredictable (natFiltration hBmeas) (itoSimpleProcess hBmeas V)

The elementary Itô integral is predictable as a space-time function. It is genuinely (every ω) continuous — hence left-continuous — and genuinely adapted (the martingale property itoSimpleProcess_isMartingale.1), so Degenne's StronglyAdapted.isStronglyPredictable_of_leftContinuous applies directly. This is the base case that sidesteps the a.e./everywhere friction which blocks applying the same lemma to the continuous modification directly.

theoremMathFin.ItoIntegralProcessContinuousModification.itoContinuousMod_isStronglyPredictablesource
∀ {Ω : Type u_1} {mΩ : MeasurableSpace Ω} {μ : Measure Ω} [IsProbabilityMeasure μ] {B : NNReal → Ω → ℝ}, IsPreBrownianReal B μ → ∀ (T : NNReal) (hBmeas : ∀ (t : NNReal), Measurable (B t)), (∀ (ω : Ω), Continuous fun t => B t ω) → ∀ (φ : ↥(Lp ℝ 2 (trimMeasure T hBmeas))), IsStronglyPredictable (natFiltration hBmeas) (itoContinuousMod T hBmeas φ)

The assembled Itô process is predictable (general integrand). By construction itoContinuousMod is the pointwise limUnder of the elementary integrals of a fixed approximating sequence Vₙ; each is predictable (itoSimpleProcess_isStronglyPredictable), and StronglyMeasurable.limUnder lifts strong predictable-measurability to the limit. (The ambient σ-algebra must be pinned to the predictable one before invoking the limit lemma, which would otherwise synthesize the default product σ-algebra.)

theoremMathFin.ItoIntegralProcessContinuousModification.memLp_itoContinuousModsource
∀ {Ω : Type u_1} {mΩ : MeasurableSpace Ω} {μ : Measure Ω} [IsProbabilityMeasure μ] {B : NNReal → Ω → ℝ}, IsPreBrownianReal B μ → ∀ (T : NNReal) (hBmeas : ∀ (t : NNReal), Measurable (B t)), (∀ (ω : Ω), Continuous fun t => B t ω) → ∀ (φ : ↥(Lp ℝ 2 (trimMeasure T hBmeas))), MemLp (Function.uncurry (itoContinuousMod T hBmeas φ)) 2 (trimMeasure T hBmeas)

The assembled Itô process is L² in the predictable trim measure. It is predictable (itoContinuousMod_isStronglyPredictable); the energy is finite because, slice by slice, the modification identity and the Itô contraction give ∫₀ᵀ ‖(φ ● B)_t‖² dt ≤ T ‖φ‖² (eLpNorm_trim drops the trim, then Tonelli splits the product and each time-slice is bounded by itoProcessCLM_norm_le).

defMathFin.ItoIntegralProcessContinuousModification.itoProcessAssembledsource
{Ω : Type u_1} → {mΩ : MeasurableSpace Ω} → {μ : Measure Ω} → [IsProbabilityMeasure μ] → {B : NNReal → Ω → ℝ} → IsPreBrownianReal B μ → (T : NNReal) → (hBmeas : ∀ (t : NNReal), Measurable (B t)) → (∀ (ω : Ω), Continuous fun t => B t ω) → ↥(Lp ℝ 2 (trimMeasure T hBmeas)) → ↥(Lp ℝ 2 (trimMeasure T hBmeas))

The assembled Itô process as an element of the predictable L² space E. The space-time function (t,ω) ↦ (φ ● B)_t(ω) (the continuous modification), packaged as a class in Lp ℝ 2 (trimMeasure T) — the object a Picard iterate for the SDE lands in.

theoremMathFin.ItoIntegralProcessContinuousModification.itoProcessAssembled_norm_sqsource
∀ {Ω : Type u_1} {mΩ : MeasurableSpace Ω} {μ : Measure Ω} [IsProbabilityMeasure μ] {B : NNReal → Ω → ℝ} (hB : IsPreBrownianReal B μ) (T : NNReal) (hBmeas : ∀ (t : NNReal), Measurable (B t)) (hBcont : ∀ (ω : Ω), Continuous fun t => B t ω) (φ : ↥(Lp ℝ 2 (trimMeasure T hBmeas))), ‖itoProcessAssembled hB T hBmeas hBcont φ‖ ^ 2 = ∫ (t : NNReal), ‖(itoProcessCLM hB T t hBmeas) φ‖ ^ 2 ∂timeMeasureHorizon T

The energy identity. ‖itoProcessAssembled φ‖²_E = ∫₀ᵀ ‖(φ ● B)_t‖² dt — the squared E-norm of the assembled process is the time-integral of the per-time Itô L²-norms. Slice by slice the modification identity turns the space-time integral (Tonelli over the trimmed product) into ∫₀ᵀ ‖itoProcessCLM T t φ‖² dt. Paired with itoProcessCLM_norm_sq (the [0,t] energy ‖itoProcessCLM T t φ‖² = ∫_{(0,t]×Ω} φ²), this is the Grönwall/Bielecki workhorse the SDE contraction consumes.

theoremMathFin.ItoIntegralProcessContinuousModification.itoProcessAssembled_norm_lesource
∀ {Ω : Type u_1} {mΩ : MeasurableSpace Ω} {μ : Measure Ω} [IsProbabilityMeasure μ] {B : NNReal → Ω → ℝ} (hB : IsPreBrownianReal B μ) (T : NNReal) (hBmeas : ∀ (t : NNReal), Measurable (B t)) (hBcont : ∀ (ω : Ω), Continuous fun t => B t ω) (φ : ↥(Lp ℝ 2 (trimMeasure T hBmeas))), ‖itoProcessAssembled hB T hBmeas hBcont φ‖ ≤ √↑T * ‖φ‖

The Itô operator bound ‖itoProcessAssembled φ‖ ≤ √T‖φ‖ — the norm corollary of the energy identity itoProcessAssembled_norm_sq: it turns the square norm into ∫₀ᵀ ‖itoProcessCLM t φ‖² dt, and each [0,t]-energy is ≤ the full energy ‖φ‖² (the Itô isometry is flat in t), so the time-integral is ≤ T‖φ‖². The √T (vs the drift's T) is the contraction workhorse.

theoremMathFin.ItoIntegralProcessContinuousModification.itoProcessAssembled_addsource
∀ {Ω : Type u_1} {mΩ : MeasurableSpace Ω} {μ : Measure Ω} [IsProbabilityMeasure μ] {B : NNReal → Ω → ℝ} (hB : IsPreBrownianReal B μ) (T : NNReal) (hBmeas : ∀ (t : NNReal), Measurable (B t)) (hBcont : ∀ (ω : Ω), Continuous fun t => B t ω) (φ ψ : ↥(Lp ℝ 2 (trimMeasure T hBmeas))), itoProcessAssembled hB T hBmeas hBcont (φ + ψ) = itoProcessAssembled hB T hBmeas hBcont φ + itoProcessAssembled hB T hBmeas hBcont ψ

Additivity of the assembled Itô process (as an Lp class). Both sides are modifications of the linear process itoProcessCLM T · (φ+ψ), so they agree slice by slice (the modification identity + itoProcessCLM's map_add); the per-time a.e. equalities lift to an a.e. equality on the trimmed product (Measure.ae_prod_iff_ae_ae + ae_eq_trim_of_stronglyMeasurable).

theoremMathFin.ItoIntegralProcessContinuousModification.itoProcessAssembled_subsource
∀ {Ω : Type u_1} {mΩ : MeasurableSpace Ω} {μ : Measure Ω} [IsProbabilityMeasure μ] {B : NNReal → Ω → ℝ} (hB : IsPreBrownianReal B μ) (T : NNReal) (hBmeas : ∀ (t : NNReal), Measurable (B t)) (hBcont : ∀ (ω : Ω), Continuous fun t => B t ω) (φ ψ : ↥(Lp ℝ 2 (trimMeasure T hBmeas))), itoProcessAssembled hB T hBmeas hBcont (φ - ψ) = itoProcessAssembled hB T hBmeas hBcont φ - itoProcessAssembled hB T hBmeas hBcont ψ

Subtractivity of the assembled Itô process (the SDE contraction consumes this: it turns itoProcessAssembled (σ∘X) − itoProcessAssembled (σ∘Y) into itoProcessAssembled (σ∘X − σ∘Y), whose energy is ∫₀ᵀ ‖itoProcessCLM T t (σ∘X − σ∘Y)‖² dt).